Berrak HPP
The construction of the Güvercin Weir and HPP located along the Çağırgan Stream in Kahramanmaraş was started in March 2014.
Project construction was undertaken by Berrak Elektrik Üretim A.Ş. while the electromechanical equipment was supplied by the Alstom-Koesler, Indar consortium.
Project Flow | 3.870 m3/sn |
Number of Units | 2 Pelton Turbines |
Installed Power | 16.37 MWe |
Power Generated | 42,010,000 KWh |