Yılsan is licensed to construct a 11.7-MW SPP in Izmir’s Ödemiş district. The development phase was completed, and the project was put into operation in early 2018.
Annual average power production capacity of the plant is 20,000 MWh.
Installed Power | 11.7 MWe |
Power Generated | 20.000 MWh |
COD | Early 2018 |