• TR
  • EN
  • HOME
  • CORPORATE
    • About Us
    • Board of Directors
    • Values
    • Social responsibility
    • Offices
  • MARKETS OF OPERATION
    • Power
    • Real Estate
    • Mining
    • Chemical
    • Textile
  • NEWS
    • Latest News About Us
  • HUMAN RESOURCES
    • HR Approach
    • Job Application
  • CONTACT
    • Contact Information
    • Contact Form

  • HOME
  • CORPORATE
    • About Us
    • Board of Directors
    • Values
    • Social responsibility
    • Offices
  • MARKETS OF OPERATION
    • Power
    • Real Estate
    • Mining
    • Chemical
    • Textile
  • NEWS
    • Latest News About Us
  • HUMAN RESOURCES
    • HR Approach
    • Job Application
  • CONTACT
    • Contact Information
    • Contact Form
  • Home Page >
  • MARKETS OF OPERATION >
  • Power >
  • Hydroelectric >
  • Çaldere Elektrik
  • Power
    • Hydroelectric
      • Çaldere Elektrik
      • Kurtsuyu Elektrik
        • Daran 1
        • Daran 2
      • DNZ Elektrik
      • ARI SU Elektrik
    • Wind
      • Simay Elektrik
      • Karayel Elektrik
    • Geothermal
      • IDA GPP
  • Real Estate
    • Marmara Anatolium
    • Kartal Coast
    • MY İnsaat: Tuzla Mall & Tower & Residence Project
  • Mining
  • Chemical
    • Azomures S.A. Chemical Fertilizer Plant, Romania
  • Textile
    • Yalova Textile Company

Çaldere Elektrik

Following its decision of 2005 to invest in renewable energy market, Yılsan started in November 2006 to construct the Çaldere HPP and Weir in Muğla’s Dalaman district, and commissioned the plant in April 2008.

In the plant, principally designed and constructed as a “Spillway Storage Weir”, the weir elevation was increased. The Çaldere HPP is equipped with a vertical pelton turbine operating at an installed power of 8.910 MWe, and a synchronous generator. Further, the electromechanical equipment for the plant was supplied by the VA TECH (France) - LEROY SOMER (France) - AREVA T&D (Austria) consortium.


The plant is proposed to generate 38 million KWh of energy annually.

Technical Properties

Project Flow

2,4 m3/s

Number of Units

1 Pelton Turbine

Installed Power

8,910 MWe

Power Generated

38.000.000 KWh

Head

430 meters


  • CONTACT US

    Vedat Gunyol Cd. Begendik Sk. No.1
    Kat 3-4 K. Bakkalkoy Atasehir İstanbul

    +(90) 216 450 55 29
    +(90) 216 550 13 80
    info@yilsanholding.com
    /yilsanholding
  • CORPORATE
    • About Us
    • Board of Directors
    • Values
    • Social responsibility
    • Offices
  • MARKETS OF OPERATION
    • Power
    • Real Estate
    • Maritime
    • Mining
    • Textile
    • Chemical
  • RAPID ACCESS
    • Home
    • Corporate
    • Markets of Operation
    • News
    • Human Resources
    • Contact
Yılsan Yatırım Holding © All rights reserved.
Web Tasarım Grimor