Berrak Elektrik
The construction of the Güvercin Weir and HPP located along the Çağırgan Stream in Kahramanmaraş was started in March 2014.
The plant was put into operation in October 2016. Boasting an installed power of 16,37 MWe, the plant is capable of generating 42 million kWh of energy annually.
Project construction was undertaken by Berrak Elektrik Üretim A.Ş. while the electromechanical equipment was supplied by the Alstom-Koesler, Indar consortium.
The plant was put into operation in October 2016. Boasting an installed power of 16,37 MWe, the plant is capable of generating 42 million kWh of energy annually.
Project construction was undertaken by Berrak Elektrik Üretim A.Ş. while the electromechanical equipment was supplied by the Alstom-Koesler, Indar consortium.
Project Flow | 3,870 m3/s |
Number of Units | 2 Pelton Turbine |
Installed Power | 16,37 MWe |
Power Generated | 42.010.000 kWh |